Resultados de la búsqueda: 8 vacantes

 ...instrumentation. Install, program, maintain, and repair control systems and associated equipment Perform Factory Acceptance Tests (FAT), Site Acceptance Test (SAT), Performance Acceptance Test (PAT), control wiring design, and logic design. Prepare and review all... 

LHR Global

San Martin, Mendoza
12 días atrás
 ...installation, configuration, and upgrade procedures. Lead/give support to plant outages, shutdowns, and chronicle problems. System testing and health monitoring, experience in using system logs for troubleshooting. Create and implement new strategies to improve... 

LHR Global

San Martin, Mendoza
12 días atrás
 ...commissioning including start-up philosophy and spare part requirements Participate in the petrochemical unit’s Performance Acceptance Test (PAT) and Reliability Availability Maintainability (RAM) study. Participate in standards reviews to ensure the inclusion of... 

LHR Global

San Martin, Mendoza
12 días atrás
 ...water injection, water supply and water disposal wells starting from monitoring the drilling operations, completion design, flow back/testing operations, chemical treatments, logging, and integrity assurance to performance remedial work for production enhancement. In... 

LHR Global

San Martin, Mendoza
12 días atrás
 ...designs for new projects and for extensions to existing systems. Review installation, site commissioning, and factory acceptance testing for low and high-voltage transformers, switchgear, circuit breakers, and control gear. Analyze the components, design parameters... 

LHR Global

San Martin, Mendoza
12 días atrás
 ...addition, the candidate must have extensive experience in Mechanical/Electrical work including troubleshooting, disassembly, reassembly, testing and equipment modification of high-voltage motors. Minimum Requirements ~ Bachelor’s Degree in Electrical Engineering ~9... 

LHR Global

San Martin, Mendoza
12 días atrás
 ...the operation of various process technologies including process design & troubleshooting, start-up and shutdown activities, capacity test runs, and technology pilot testing. Propose cost optimization or process improvement initiatives focusing on ‘low-hanging fruits’... 

LHR Global

San Martin, Mendoza
8 días atrás
 ...Utilities which may include but not limited to process design, process troubleshooting, start-up and shutdown activities and capacity test runs. Issue service report for every support activity provided highlighting the facilities need, actions taken, results, and lessons... 

LHR Global

San Martin, Mendoza
8 días atrás